How to synchronise and parallel a ship’s generator
CHIEF. LEARN · Guide 1 of 7
Paralleling a second diesel generator with the one on the bus, step by step: the synchroscope, the sync lamps, when to close the breaker and how to share the load.
The example throughout is the engine control room of a Supramax bulk carrier: three diesel generators on a 440 V, 60 Hz main switchboard with a bus-tie and a power management system, an emergency generator feeding the emergency switchboard, the main engine controlled from the ECR console, and a UV ballast water treatment system.
- AVR
- automatic voltage regulator
- ECR
- engine control room
- DG
- diesel generator
- ACB
- air circuit breaker: the generator breaker on the main switchboard
- PMS
- power management system: starts, connects and shares the generators
Why a second generator goes on the bus
At sea one diesel generator often carries the whole load. Before a heavy consumer starts, before manoeuvring or when the load climbs towards the limit of one machine, a second DG goes on the bus. Two machines in parallel also mean that one trip does not black the ship out.
Paralleling means connecting a running generator to a bus that is already live. The incoming machine must match the bus in four things: phase sequence, voltage, frequency and phase angle at the moment the breaker closes. The phase sequence is fixed when the switchboard is built. The voltage comes up to the right value by itself through the AVR. Frequency and phase angle are yours: you set them with the governor and with your timing.
Most ships do this automatically through the PMS. You do it by hand when the PMS is in manual, when it fails, or when you have to prove you can.
Reading the synchroscope and the sync lamps
The synchroscope compares the incoming generator with the bus. When the pointer turns clockwise, towards FAST, the incoming machine runs faster than the bus; anticlockwise, towards SLOW, it runs slower. The faster the pointer turns, the bigger the difference: one turn per second means 1 Hz.
At 12 o’clock the two are in phase. The sync lamps tell the same story: they go dark when the voltages are in phase and brightest when they are opposite.
You want the pointer turning slowly in the FAST direction, so that the incoming machine is a little faster than the bus. Then it takes a little load the moment its breaker closes instead of being driven by the bus as a motor. In the trainer that window is +0.03 to +0.3 Hz: about one turn every 3 to 30 seconds.
The breaker needs a moment to close, so you give the order just before 12 o’clock, at 11 to 12, with the lamps dark.
Step by step: DG2 in parallel with DG1
- Start DG2 with the green DG START on No.2 generator panel. Wait until its controller shows about 450 V and 60 Hz.
- Turn the SYNC GEN SELECT switch on the synchronising panel to G2. The synchroscope and the sync lamps now compare DG2 with the bus.
- Adjust the speed with GOV RAISE or GOV LOWER until the pointer turns slowly clockwise. In the trainer DG2 starts a little slow, so it needs GOV RAISE.
- Close the DG2 ACB with ACB CLOSE when the pointer is at 11 to 12 o’clock and the lamps are dark.
- Share the load: GOV RAISE on No.2 panel, or GOV LOWER on No.1, until both generators show the same kW.
- Turn SYNC GEN SELECT back to OFF.
What goes wrong
Closing out of phase: the bus pulls the incoming machine into step in a fraction of a second. The current surge and the torque on the shaft and coupling are heavy, and the breaker may trip. This is why the poster in the ECR says never parallel without synchronising.
Closing with the incoming machine slower than the bus: it takes power from the bus and runs as a motor. The reverse power relay trips it, and the load jumps back onto the machine that was already running.
Forgetting the selector: leaving SYNC GEN SELECT on a generator keeps the synchroscope connected and confuses the next person who uses it.
Check yourself
The synchroscope pointer turns slowly anticlockwise. What do you do before you close the breaker?
- Raise the speed of the incoming generator — correct
- Close the breaker at 12 o’clock
- Lower the speed of the incoming generator
Anticlockwise means the incoming machine is slower than the bus. Raise its governor until the pointer turns slowly clockwise, then close just before 12.
Why close the breaker with the incoming machine slightly faster than the bus?
- It takes a little load at once instead of motoring — correct
- The breaker closes faster
- The voltage rises
A slightly faster machine picks up some load the moment it is connected. A slower one is driven by the bus and can trip on reverse power.
After the breaker is closed, what does raising the incoming generator’s governor do?
- It moves kW onto that generator — correct
- It raises the bus frequency by the same amount
- It raises the bus voltage
Generators in parallel run at one frequency. The governor now sets the share of the active load; lower the other machine to keep the frequency.