Engine control room guides
CHIEF. LEARN · 7 guides
The procedures behind the ECR — Engine Control Room simulator, one scenario per page: what you do at each panel, in what order, and why.
The example throughout is the engine control room of a Supramax bulk carrier: three diesel generators on a 440 V, 60 Hz main switchboard with a bus-tie and a power management system, an emergency generator feeding the emergency switchboard, the main engine controlled from the ECR console, and a UV ballast water treatment system.
- 01How to synchronise and parallel a ship’s generatorParalleling a second diesel generator with the one on the bus, step by step: the synchroscope, the sync lamps, when to close the breaker and how to share the load.
- 02Blackout on a ship: restoring main power from the ECRWhat to do in the engine control room when the main switchboard goes dead: the emergency generator, the cause, the standby generator on the dead bus, the essential consumers and the bridge.
- 03Starting the main engine from the engine control roomStand by, control to the ECR, the pumps that must run, and answering the telegraph from DEAD SLOW AHEAD to HALF AHEAD, as in the ECR trainer.
- 04Engine room fire: first actions from the ECRA fire alarm in the purifier room: silence and acknowledge, inform the bridge, call the engineers, stop the purifiers and the fans, and why fixed CO₂ is the Master’s order.
- 05Oil mist detector: the weekly function testWhy a main engine has a crankcase oil mist detector, what the weekly test proves, and the sequence from the ECR: bridge, TEST, alarm and slowdown, acknowledge, reset.
- 06Ballasting through the ballast water treatment systemStarting a UV ballast water treatment system for ballasting: power, warm-up, treated volume, UV transmittance and the Ballast Water Record Book entry.
- 07Lock-out / tag-out in the engine roomIsolating machinery before work on board: the permit to work, every energy source, the breaker locked off, your own lock and DANGER tag, the test for dead, and who removes the lock.