Ballasting through the ballast water treatment system
CHIEF. LEARN · Guide 6 of 7
Starting a UV ballast water treatment system for ballasting: power, warm-up, treated volume, UV transmittance and the Ballast Water Record Book entry.
The example throughout is the engine control room of a Supramax bulk carrier: three diesel generators on a 440 V, 60 Hz main switchboard with a bus-tie and a power management system, an emergency generator feeding the emergency switchboard, the main engine controlled from the ECR console, and a UV ballast water treatment system.
- MSB
- main switchboard
- MCCB
- moulded-case circuit breaker
- BWTS
- ballast water treatment system
- UVT
- UV transmittance: how much ultraviolet light gets through the water
Why the ship treats its ballast
Ballast water carries organisms from one port to the next. Under the IMO Ballast Water Management Convention every ship manages its ballast to a standard set out in a ship-specific plan, and carries a Ballast Water Record Book and an International Ballast Water Management Certificate.
Most ships meet the discharge standard with a type-approved BWTS. The system in the trainer filters the water and treats it with ultraviolet light on the way into the tanks.
The scenario: no power to the BWTS
In the trainer the BWTS will not start. Its MSB feeder, the moulded-case breaker BALLAST WATER TREATMENT on 440 V feeder panel No.2, was left OFF after maintenance.
The fault is common on board: a system that has not run since a job was done on it. Before you look for a fault in the equipment, check that it has power.
Step by step
- Find why the BWTS has no power and switch its MSB feeder ON: MCCB BALLAST WATER TREATMENT on 440 V feeder panel No.2.
- Start the BWTS in BALLAST mode on its remote panel, on the forward bulkhead to the left of the engine room door.
- Wait for the UV lamps to warm up. The status changes to BALLAST · TREATING.
- Treat at least 300 m³, watching the treated volume on the BWTS display. If the UV transmittance alarm comes, acknowledge it.
- Stop the BWTS with a normal STOP. The operation is written to the system log for the Ballast Water Record Book entry.
UV transmittance
UV light only treats what it reaches. In muddy or coloured harbour water less of it gets through, and the UV transmittance (UVT) falls.
To keep the dose the organisms receive, the system reduces the flow. Ballasting takes longer, and the trainer raises an alarm when the UVT is low. If the system cannot hold its dose, the water is not treated to the standard.
The record
Every ballast operation goes into the Ballast Water Record Book: when, where, how much and how it was treated. A port State control officer reads it next to the system’s own log.
A treatment that stopped is recorded too. In the trainer a power failure during ballasting stops the treatment and says so: POWER FAILURE — treatment stopped, record in the Ballast Water Record Book.
Check yourself
The BWTS will not start after maintenance. What do you check first?
- That its feeder on the MSB is switched on — correct
- The UV lamps
- The ballast pump impeller
In the trainer the MCCB was left OFF after maintenance. Power first, then the equipment.
What happens when the UV transmittance of the water is low?
- The system reduces the flow to keep the dose — correct
- The system treats faster
- Nothing changes
Less UV gets through murky water, so the system slows the flow so each litre still gets its dose.
Sources
For training only. The room, the switchboard and the sequences are simplified; class rules, the makers’ manuals and your company’s procedures are the authority.